All platform modules
WorkHubInspections

Construction inspection software with checklists, pass/fail tracking, and corrective task spawning

Schedule inspections, record pass/fail, attach photos, and spawn tasks for failures - with pass-rate rollups PMs and owners trust.

Construction Software

Inspections & QA/QC

This is a quality assurance and quality control (QA/QC) tool for construction inspections. It schedules inspections, executes pass/fail checklists, attaches photo evidence, spawns corrective tasks from failures, and rolls up pass rates for project managers and owners - replacing paper forms with structured, traceable verification.

WorkHub

Part of WorkHub

  • Inspection register with type, location, inspector, and scheduled vs complete filters
  • Checklist templates for special inspections, QA walks, and safety rounds
  • Pass/fail/pending states with corrective task spawning and photo evidence
  • Pass-rate analytics by trade and phase with milestone linkage

The problem

Clipboard inspections do not connect to punch

When inspection failures live on paper, corrective work gets lost. When pass/fail is not visible to the PM, quality trends disappear until an owner audit or failed milestone. Link inspections to tasks and daily context automatically - so failures spawn corrective work with owners and due dates, and pass rates roll up for weekly reviews without a pivot table.

From schedule to close - with corrective clarity

A structured path for QA/QC that respects field cadence and compliance requirements.

  1. 01

    Schedule the inspection

    Create an inspection with type, location, inspector, and due date - structured enough for compliance, fast enough for daily use.

  2. 02

    Execute with checklist

    Inspector works through pass/fail items on mobile. Attach photos and notes as conditions are verified.

  3. 03

    Spawn corrective tasks

    Failed items become tasks with one click - assignee, location, and trade inherit from the inspection so punch is automatic.

  4. 04

    Close and analyze

    Mark complete with pass/fail state. Pass rates roll up to Overview and reports without a status deck rebuild.

QA/QC workflows end to end

  • Inspection register

    Filter by status, type, location, and inspector. See what is scheduled vs complete so compliance gaps surface before audits.

  • Checklist templates

    Standardize special inspections, QA walks, and safety rounds per project type - reusable templates aligned to specs and trade practice.

  • Pass / fail / pending

    Clear states with badges aligned to your design system - readable in the field and consistent across projects.

  • Corrective tasks

    One click to open a task from a failed item with location and trade pre-filled - inspection result becomes assigned work without double entry.

  • Photo evidence

    Document conditions at inspection time for owners and regulators - photo timestamps and attribution stay on the record.

  • Pass-rate analytics

    Roll up pass rates by trade and phase for weekly reviews - quality trends visible without manual reporting.

Deep dive

Inspection drawers with depth

Full detail without leaving the register - assignees, dates, checklist progress, and linked work visible in one drawer.

  • Type and location fields for filtering and compliance reports
  • Inspector assignment with due dates and overdue alerts
  • History of attempts and re-inspections on the same record

Tasks · My work

OpenOverdueMine
  • T-067Punch - Level 4 waterproofing

    MEP · Due Fri

  • T-068Close corridor firestop

    You · Today

  • T-069Verify handrail torque

    Done

Deep dive

Tied to schedule milestones

Hold milestones until critical inspections pass - visible on Overview so blocked work surfaces before the weekly meeting.

  • Overview KPI cards show inspection pass rate
  • Deep link from tasks to related inspections
  • Export for closeout binders and regulatory compliance

Tasks · Board

Open

Install door hardware

Paint touch-up L3

In progress

Punch package A

Done

Firestop corridor

Deep dive

Checklist templates that scale

Reusable templates per project type - structural steel, MEP rough-in, waterproofing, safety walks - with pass/fail items aligned to specs.

  • Template library with trade and phase tags
  • Clone and customize per project requirements
  • Activity log on template changes for audit

A-401 · Floor plan

6714

2 open pins on this sheet

Rev C
We used to track inspections on paper and hope failures turned into punch. Now failed items spawn tasks automatically - our pass rate improved fifteen points in six months.
James ParkQuality Manager, Horizon Commercial Builders

Built for everyone who owns quality and verification

  • Quality managers & inspectors

    Schedule inspections, execute checklists on mobile, and spawn corrective tasks without paper forms or duplicate data entry.

  • Project managers

    See pass rates, overdue inspections, and compliance gaps on Overview - drill into registers when quality trends need attention.

  • Owners & regulators

    Read-only views and exports for governance and compliance - photo evidence and pass-rate history without field clutter.

FAQ

Inspections & QA/QC FAQ

How inspections connect to corrective work and quality trends.

Construction inspection software schedules QA/QC inspections, records pass/fail with checklists, attaches photo evidence, and links failures to corrective tasks - so quality verification is structured, traceable, and connected to punch instead of stranded on paper.

When an inspection item fails, the inspector can create a task with one click - assignee, location, and trade inherit from the inspection so corrective work is automatic and traceable.

Yes. Templates standardize special inspections, QA walks, and safety rounds per project type - reusable checklists aligned to specs and trade practice.

Yes. Pass rates roll up by trade and phase on Overview and in reports - quality trends visible without manual pivot tables or status deck rebuilds.

Inspections can gate milestones so critical verifications must pass before work proceeds - blocked milestones surface on Overview as schedule risks.

Yes. Checklists, photo capture, and pass/fail states adapt to mobile screens - inspectors finish verification on site without paper forms or laptop trips.

Build on the Construction OS

Join the waitlist for Aroclad - field and office collaboration inside a platform built for the full construction lifecycle.